Sub-Projects (Tranche - II & Tranche - III)

Package No.
PCSS
Status / Contract Type
Contractor Name SLEC Approved DPR Cost (INR Crore) Contract Amount
(US $ Million)
($1=63.00 INR)
ADB Financing
(US $ Million)
($1=63.00 INR)
Agreement Date
UK/IDIPT-III/BHT/03
0012
Awarded / Works
M/s Simplex Project Limited
407, Skipper Corner, 88 Nehru Place, New Delhi - 110019, India

39.70

4.75

(INR 299.04 Million)
(INR 29.90 Crore)
With Variation
5.02
(INR 316.00 Million)
(INR 31.60 Crore)
3.09
65% of Award Value
19-10-2015
Contract Start Date Contract Period Completion Date
(As per contract start date)
Sub-Project Valley
19-10-2015 24 Months 18-10-2017 18-10-2017 Katyur Valley
Sub-Project Output
  • Enhanced quality of natural and cultural attractions
Overall Physical Progress(%) as on September 2017 & Financial Progress (%) till date
Physical Progress (%) Financial Progress (%) Disbursed
(INR Million)
Remarks
36.53 35.95 107.34 .
Sub-Project Main Components / Scope of work View Photo Gallery
Latest Photos
Non basement area (Ground floor) on 06.10.2017 Non basement area (Ground floor) on 06.10.... Non basement area 1st floor shuttering work on 06.10.2017 Non basement area 1st floor shuttering wor... Top view of Almora Site on 01.08.2017 Top view of Almora Site on 01.08.2017
Public Consultation / Disclosure / Orientation Meeting Total Employment (Skilled / Unskilled) Labor
No. of Community member involved
Male Female Total Male Female Total
14 14 41 7 48
Pollution Status
AIR
Parameter Base Data Present Data
PM10 56.20 61.45
SO2 7.22 8.35
NO2 16.43 19.80
CO 0.30 0.24

Present Data: 10-02-2017 Present Data Report
WATER
Parameter Base Data Present Data
Colour <5 <5
Turbidity BDL BDL
pH 7.22 7.10
Total Hardness 345.00 178.00
TDS 365.00 315.30
MPN Absent Absent
Faecal Coliform Absent Absent

Present Data: 05-02-2017 Present Data Report
NOISE
Parameter Base Data Present Data
Average 46.55 44.55
Maximum 48.9 49.2
Minimum 44.2 39.2
Leq. dB(A) 55.0 45.3

Present Data: 10-02-2017 Present Data Report
News & Updates
  • Review Meeting held on  September 04th 2017 at UTDB Conference Hall. The Secretary & Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from May 23, 2017 till May 26, 2017. ADB Review meeting is going to be held on May 25,2017 at IDIPT conference hall.
  • UTTARAKHAND HIMMLAYAN MTB CHALLENGE  (3rd  Edition) of  8th - 16th April 2017 for participation ditails please visit website : www mtbuttarakhand.co.in
  • ADB mission visiting IDIPT from November 28, 2016 till December 02, 2016. ADB Review meeting is going to be held on December 01,2016 at IDIPT conference hall.
  • This is to inform you that Asan Conservation Resort,  Dehradun constructed under ADB Assistant Project is being inaugurated on 06 Aug 2016 by the Hon,ble tourism Minister, Govt of Uttarakhand
  • Review Meeting held on May 5 & 6 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • Review Meeting held on March 17 & 18 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from February 22 to February 25, 2016.
  • Work shop on environment and social safeguards 20th February 2016 IDIPT (UTDB)
  • Review Meeting held on February 9,10 & 11 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.
  • ADB & DEA has approved the Tranche - III and loan signing is fixed on September 28, 2015 in GoI, MoF, New Delhi.

  • ADB mission visiting IDIPT from September 21 to September 30, 2015.

    The objective is to observe the performance of ongoing sub-projects.

  • CTS Review Meeting held on September 14, 2015 at UTDB Conference Hall. Addl. Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss progress reports, identify new tourist destinations etc.

  • Review Meeting held on August 10, 2015 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss the physical & financial progress of ongoing sub-projects of Tranche - II

Other Links