Sub-Projects (Tranche - II & Tranche - III)

Package No.
PCSS
Status / Contract Type
Contractor Name SLEC Approved DPR Cost (INR Crore) Contract Amount
(US $ Million)
($1=63.00 INR)
ADB Financing
(US $ Million)
($1=63.00 INR)
Agreement Date
UK/IDIPT/DDN/03
0015
Completed / Works
M/s Aradhya Engineers & Constructions Pvt. Ltd
2nd Tulsi Vihar, Hardwar Road, Post- Virbhadra, Rishikesh (UA)

1.84

0.27

(INR 17.30 Million)
(INR 1.73 Crore)
With Variation
0.29
(INR 18.12 Million)
(INR 1.81 Crore)
0.16
59% of Award Value
09-06-2014
Contract Start Date Contract Period Completion Date
(As per contract start date)
Sub-Project Valley
24-06-2014 18 Months
Ext. 1.11(M)
08-12-2015
19-01-2016
23-12-2015
03-02-2016
Yamuna Valley
Sub-Project Output
  • Urban infrastructure and services at tourist destinations and attractions
Overall Physical Progress(%) as on November 2016 & Financial Progress (%) till date
Physical Progress (%) Financial Progress (%) Disbursed
(INR Million)
Remarks
100 96.78 17.53 Tigerfall handed over for O & M on 4th April-16 to Tigerfall Utthan and Bahu-uddesheey Paryatan Vikas Samiti and Lakhamandal Project handed over for O & M on 13th May -16 to Gram Panchayat.
Sub-Project Main Components / Scope of work View Photo Gallery
Latest Photos
ADB mission team visited at Tigerfall on dated 29.11.16 ADB mission team visited at Tigerfall on d... ADB Mission ( 29.11.16)-Tigerfall ADB Mission ( 29.11.16)-Tigerfall ADB mission team visited at Tigerfall on dated 29.11.16 ADB mission team visited at Tigerfall on d...
Public Consultation / Disclosure / Orientation Meeting Total Employment (Skilled / Unskilled) Labor
No. of Community member involved
Male Female Total Male Female Total
50 50 4 9 13
Pollution Status
AIR
Parameter Base Data Present Data
PM10 82.0 75.10
SO2 12.3 11.80
NO2 27.8 17.40
CO - ND
Base Data: 19-03-2014
Present Data: 15-07-2015
Base Data Report Present Data Report
WATER
Parameter Base Data Present Data
Colour - BDL(DL-5 Hazen)
Turbidity - BDL(DL-I NTU)
pH 7.32 7.35
Total Hardness - 390.20
TDS 8.0 450
MPN - -
Faecal Coliform - <2/100 ml
Base Data: 19-03-2014
Present Data: 15-07-2015
Base Data Report Present Data Report
NOISE
Parameter Base Data Present Data
Average 48.3 55
Maximum 53.6 61.2
Minimum 42.9 50.2
Leq. dB(A) 55 54
Base Data: 19-03-2014
Present Data: 15-07-2015
Base Data Report Present Data Report
News & Updates
  • Review Meeting held on  September 04th 2017 at UTDB Conference Hall. The Secretary & Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from May 23, 2017 till May 26, 2017. ADB Review meeting is going to be held on May 25,2017 at IDIPT conference hall.
  • UTTARAKHAND HIMMLAYAN MTB CHALLENGE  (3rd  Edition) of  8th - 16th April 2017 for participation ditails please visit website : www mtbuttarakhand.co.in
  • ADB mission visiting IDIPT from November 28, 2016 till December 02, 2016. ADB Review meeting is going to be held on December 01,2016 at IDIPT conference hall.
  • This is to inform you that Asan Conservation Resort,  Dehradun constructed under ADB Assistant Project is being inaugurated on 06 Aug 2016 by the Hon,ble tourism Minister, Govt of Uttarakhand
  • Review Meeting held on May 5 & 6 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • Review Meeting held on March 17 & 18 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from February 22 to February 25, 2016.
  • Work shop on environment and social safeguards 20th February 2016 IDIPT (UTDB)
  • Review Meeting held on February 9,10 & 11 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.
  • ADB & DEA has approved the Tranche - III and loan signing is fixed on September 28, 2015 in GoI, MoF, New Delhi.

  • ADB mission visiting IDIPT from September 21 to September 30, 2015.

    The objective is to observe the performance of ongoing sub-projects.

  • CTS Review Meeting held on September 14, 2015 at UTDB Conference Hall. Addl. Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss progress reports, identify new tourist destinations etc.

  • Review Meeting held on August 10, 2015 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss the physical & financial progress of ongoing sub-projects of Tranche - II

Other Links