Sub-Projects (Tranche - II & Tranche - III)

Package No.
PCSS
Status / Contract Type
Contractor Name SLEC Approved DPR Cost (INR Crore) Contract Amount
(US $ Million)
($1=63.00 INR)
ADB Financing
(US $ Million)
($1=63.00 INR)
Agreement Date
UK/IDIPT/KOT/03 - Lot 2
0024
Awarded / Works
Jai Durgey Trading & Construction Co. in JV with Sunil Garg and Company
India

13.46

1.90

(INR 119.76 Million)
(INR 11.98 Crore)
With Variation
2.34
(INR 147.69 Million)
(INR 14.77 Crore)
1.12
59% of Award Value
30-12-2014
Contract Start Date Contract Period Completion Date
(As per contract start date)
Sub-Project Valley
29-01-2015 17 Months
Ext. 11.03(M)
29-05-2016
02-05-2017
28-06-2016
31-05-2017
Bhagirathi Valley
Sub-Project Output
  • Urban infrastructure and services at tourist destinations and attractions
Overall Physical Progress(%) as on August 2017 & Financial Progress (%) till date
Physical Progress (%) Financial Progress (%) Disbursed
(INR Million)
Remarks
100.00 93.25 135.07 1. MAIN BULDING:
a) All RCC work including RCC roof slab is almost completed.
b) Brick work is completed.
c) Plastering work is completed.
d) Decorative arch work for elevation purpose is completed.
e) Tile and kota stone works are completed.
f) Putty works on the internal wall is almost completed.
g) Sanitary and plumbing is almost completed.
h) Main Road side ramp works is completed.
i). POP false ceiling works are almost completed.
j). Aluminium frame fixing for windows are completed.
k). Door fixing for family and bed room are completed.
l). furniture work are completed.
m).Marble stone works for staircases are completed.
n) Outside painting works of the building are completed.
2. Semi permanent road works are completed.
3. Septic tank and soak pit (2 nos.) works are completed.
4. Electrical conduit and wiring works on wall and slab are completed.
5. Compound wall works are completed.
6. Passenger lift and Service lift installation works are completed.
7. RRM Retaining Wall (Extra Item) are completed.
8. WBM and PCC of Semi Permanent Road completed.
9. Paver Block laying on road is completed.
10. staircase railing work are completed.
11. Landscaping work are completed and maintenance are under process.
12. Boundary railing painting works are completed.
13. Water fountain works are completed.
14. Furniture installation works are completed
Sub-Project Main Components / Scope of work View Photo Gallery
Latest Photos
View from South-West_2 View from South-West_2 View from South-West_1 View from South-West_1 View from South-East_2 View from South-East_2
Public Consultation / Disclosure / Orientation Meeting Total Employment (Skilled / Unskilled) Labor
No. of Community member involved
Male Female Total Male Female Total
2 2 2 2
Pollution Status
AIR
Parameter Base Data Present Data
PM10 - 54.5
SO2 - 16.2
NO2 - 13.1
CO - Not Detected
Base Data: 21-04-2015
Present Data: 10-12-2015
Base Data Report Present Data Report
WATER
Parameter Base Data Present Data
Colour - -
Turbidity - -
pH - 7.6
Total Hardness - 168
TDS - 384
MPN - -
Faecal Coliform - Not detected.
Base Data: 21-04-2015
Present Data: 10-12-2015
Base Data Report Present Data Report
NOISE
Parameter Base Data Present Data
Average - 62.95
Maximum - 63.7
Minimum - 62.2
Leq. dB(A) - 62.5
Base Data: 21-04-2015
Present Data: 10-12-2015
Base Data Report Present Data Report
News & Updates
  • Review Meeting held on  September 04th 2017 at UTDB Conference Hall. The Secretary & Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from May 23, 2017 till May 26, 2017. ADB Review meeting is going to be held on May 25,2017 at IDIPT conference hall.
  • UTTARAKHAND HIMMLAYAN MTB CHALLENGE  (3rd  Edition) of  8th - 16th April 2017 for participation ditails please visit website : www mtbuttarakhand.co.in
  • ADB mission visiting IDIPT from November 28, 2016 till December 02, 2016. ADB Review meeting is going to be held on December 01,2016 at IDIPT conference hall.
  • This is to inform you that Asan Conservation Resort,  Dehradun constructed under ADB Assistant Project is being inaugurated on 06 Aug 2016 by the Hon,ble tourism Minister, Govt of Uttarakhand
  • Review Meeting held on May 5 & 6 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • Review Meeting held on March 17 & 18 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting
  • ADB mission visiting IDIPT from February 22 to February 25, 2016.
  • Work shop on environment and social safeguards 20th February 2016 IDIPT (UTDB)
  • Review Meeting held on February 9,10 & 11 2016 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.
  • ADB & DEA has approved the Tranche - III and loan signing is fixed on September 28, 2015 in GoI, MoF, New Delhi.

  • ADB mission visiting IDIPT from September 21 to September 30, 2015.

    The objective is to observe the performance of ongoing sub-projects.

  • CTS Review Meeting held on September 14, 2015 at UTDB Conference Hall. Addl. Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss progress reports, identify new tourist destinations etc.

  • Review Meeting held on August 10, 2015 at UTDB Conference Hall. The Program Director, IDIPT chaired the meeting.

    The objective of the meeting was to discuss the physical & financial progress of ongoing sub-projects of Tranche - II